November 2005 - Start of Week 3
Here we are, after 2 weeks of work, on the monday of week 3. The drains at the bowl end are in, the bank has been stripped back to bare earth.
-
Looking towards the deep end of the bowl, from where the mini ramp will be. The bank has been stripped right back and the blockwork is going in.
-
...and the shallow end, seen roughly from where the flatbank will be. The diagonal dug up area is where the drain has been put in.
-
Looking down the flatbank, over the funbox and towards the big roll-in / pyramid.
-
This is taken from the top of the flatbank, standing in the plaza section. Just in front of us will be the drop-offs and banks, and further forwards, the big roll-in / pyramid
-
Now we've moved to the right, roughly to where the big handrail will be, and looking back towards the mini ramp/funbox area.
-
Looking towards the plaza. We're standing on the miniramp / half pyramid.