19th February 2006 - Week 15
A couple of pics from thursday. They've poured a couple of new bits and some of the vertical faces, a lot of the flat sections are being made ready for pouring.
-
The funbox top hubba and top platform, which has just been poured.
-
The 5 foot mini ramp takes shape, the platform is drying and the bottom being made ready for pouring. Also the side walls have been done or are drying.
-
A view of the spine between the 5 foot and 4 foot minis.
-
The wall has been poured. This is at the back of the 4 foot mini. Behind the wall is a pyramid leading onto the street course.