14th January 2006 - End of Week 10
First week back after the two-week christmas break. The bowl platform and surrounding wall is virtually ready for the concrete pouring. Much of the blockwork for the middle section is now in place, and the bank has been prepared ready for the paving to go down. The first concrete should go down in about a week. Apologies for some of the photos, I had camera issues when I was on site and had to go back later and peek through the fence.
-
The bowl. The rebar for the platform is now all in, ready for concrete pouring.
-
Looking down over the funbox, towards the mini ramps
-
Standing on the top of the rollin / pyramid, lokking towards the mini ramps.